All ACS codes
SkillAA.VII.B.S2
Establish a power-off descent approximately straight-ahead if the powerplant failure occurs after becoming airborne and before reaching an altitude where a s...
ATP Airplane ACS › VII. Emergency Operations › B. Powerplant Failure During Takeoff
Establish a power-off descent approximately straight-ahead if the powerplant failure occurs after becoming airborne and before reaching an altitude where a safe turn can be made (ASEL, ASES) or the performance capabilities and operating limitations of the airplane do not allow the climb to continue (AMEL, AMES).
No linked study material for this code yet — check back soon.