All ACS codes
SkillAA.II.B.S1
Ensure the ground safety procedures are followed during the before-start, start, and after-start phases.
ATP Airplane ACS › II. Preflight Procedures › B. Powerplant Start
Ensure the ground safety procedures are followed during the before-start, start, and after-start phases.
No linked study material for this code yet — check back soon.